Wastewater Collection
When you combine using what you have (rehabilitation) with effectively funding what you don’t have (implementation), the results speak for themselves.
Bridge Street Corridor Water & Sewer Capacity Study
The Ohio State University Stone Lab Conceptual Sewer & Water Study
CIP Development Services
Service Request Centers
Fairborn Interceptor Sewer
Southeast Sewer Shed Sanitary Sewer and Design
SSES, Smoke, and Dye Testing
Rainfall Derived Inflow and Infiltration Study
Republican Run
Vine Street Pump Station
Sanitary Sewer Model
Olentangy Interceptor Sewer (OSIS) & Augmentation and Relief Sewer (OARS)
North Fork Indian Run Sewer Model
Plum Ridge Sewer System Remediation II Study
Blacklick Creek Sanitary Interceptor Sewer
Minford Collection System
Greenlawn Sanitary Pump Station
Jerome Pump Station
Hoover Farms Pump Station, Force Main, Trunk Sewer
Old Worthington Road Sanitary Improvements
Capacity, Maintenance, Operations & Management (CMOM), Director's Findings & Orders (DFFO)
Annual Sanitary Sewer Evaluations
Capacity, Maintenance, Operation, & Management (CMOM) Director’s Final Findings and Orders (DFFO)
Capacity, Maintenance, Operations & Management (CMOM), Director's Final Findings & Orders (DFFO)
GIS Work Order Management Center
Groveport Park Sanitary Lift Station
Blacklick Creek Trunk Sewer
Olde Falls Road Muskingum County Wastewater Improvements
West Farmington Decentralized Wastewater Collection & Treatment Conceptual Planning & Funding
Water & Sewer Rate Study, City of Groveport
Mulberry Run Subtrunk Sewer Extension
The Groves SSES Master Plan & Implementation Design
Central College Subtrunk to Big Walnut Trunk Sewer
SYSTEM Characterization and assessment
- Sanitary Sewer Evaluation Surveys (SSES)
- Closed Circuit Television Inspection, Sewer Cleaning, Manhole Inspection, Smoke Testing, Dye Testing
- Capacity Assurance Field Services
- Flow Monitoring, Rain Gauging
Operation and Maintenance
- Record Plan Scanning and Data Management
- Work Order Tracking
- Operation and Maintenance Program Review
- Capacity, Management, Operation, and
- Maintenance (CMOM) Compliance
- GASB 34 Requirements
System Analysis, Regulatory andPlanning
- Capacity Assurance Planning
- Hydraulic Modeling
- Combined and Sanitary Sewer Management
- Long Term Control Plan and Implementation Optimization
- Data Management (including GIS and
- InfoNet Platforms)
- Flow Isolation and I/I Analysis
Detailed Design Services
- Preparation of Construction Drawings,
- Specifications and Bid Documents for Renewal and Rehabilitation Projects
- Sewer Collection System
- – Pump Stations, regulator, Centralized Sanitary Sewer, Package WWTP and Rehabilitation, Combined Sewer Separation and Inflow Redirection
- Collection System Rehabilitation and – Renewal
- Trenchless and Open Cut Technologies
- Construction Technology, Value Engineering
- and Constructability Reviews
- Regulatory Agency Review and Permitting
- Preparation of Project Cost Estimates
CONSTRUCTION SERVICES
- Consultation During Construction
- Shop Drawing Review
- Resident Project Representation
- Contract Management
Let’s connect.
There’s an easy way to see how we can help. Let’s Talk about it.