Wastewater Collection
When you combine using what you have (rehabilitation) with effectively funding what you don’t have (implementation), the results speak for themselves.

Bridge Street Corridor Water & Sewer Capacity Study

The Ohio State University Stone Lab Conceptual Sewer & Water Study

CIP Development Services

Service Request Centers

Fairborn Interceptor Sewer

Southeast Sewer Shed Sanitary Sewer and Design

SSES, Smoke, and Dye Testing

Rainfall Derived Inflow and Infiltration Study

Republican Run

Vine Street Pump Station

Sanitary Sewer Model

Olentangy Interceptor Sewer (OSIS) & Augmentation and Relief Sewer (OARS)

North Fork Indian Run Sewer Model

Plum Ridge Sewer System Remediation II Study

Blacklick Creek Sanitary Interceptor Sewer

Minford Collection System

Greenlawn Sanitary Pump Station

Jerome Pump Station

Hoover Farms Pump Station, Force Main, Trunk Sewer

Old Worthington Road Sanitary Improvements

Capacity, Maintenance, Operations & Management (CMOM), Director's Findings & Orders (DFFO)

Annual Sanitary Sewer Evaluations

Capacity, Maintenance, Operation, & Management (CMOM) Director’s Final Findings and Orders (DFFO)

Capacity, Maintenance, Operations & Management (CMOM), Director's Final Findings & Orders (DFFO)

GIS Work Order Management Center

Groveport Park Sanitary Lift Station

Blacklick Creek Trunk Sewer

Olde Falls Road Muskingum County Wastewater Improvements

West Farmington Decentralized Wastewater Collection & Treatment Conceptual Planning & Funding

Water & Sewer Rate Study, City of Groveport

Mulberry Run Subtrunk Sewer Extension

The Groves SSES Master Plan & Implementation Design

Central College Subtrunk to Big Walnut Trunk Sewer
SYSTEM Characterization and assessment
- Sanitary Sewer Evaluation Surveys (SSES)
- Closed Circuit Television Inspection, Sewer Cleaning, Manhole Inspection, Smoke Testing, Dye Testing
- Capacity Assurance Field Services
- Flow Monitoring, Rain Gauging
Operation and Maintenance
- Record Plan Scanning and Data Management
- Work Order Tracking
- Operation and Maintenance Program Review
- Capacity, Management, Operation, and
- Maintenance (CMOM) Compliance
- GASB 34 Requirements
System Analysis, Regulatory andPlanning
- Capacity Assurance Planning
- Hydraulic Modeling
- Combined and Sanitary Sewer Management
- Long Term Control Plan and Implementation Optimization
- Data Management (including GIS and
- InfoNet Platforms)
- Flow Isolation and I/I Analysis
Detailed Design Services
- Preparation of Construction Drawings,
- Specifications and Bid Documents for Renewal and Rehabilitation Projects
- Sewer Collection System
- – Pump Stations, regulator, Centralized Sanitary Sewer, Package WWTP and Rehabilitation, Combined Sewer Separation and Inflow Redirection
- Collection System Rehabilitation and – Renewal
- Trenchless and Open Cut Technologies
- Construction Technology, Value Engineering
- and Constructability Reviews
- Regulatory Agency Review and Permitting
- Preparation of Project Cost Estimates
CONSTRUCTION SERVICES
- Consultation During Construction
- Shop Drawing Review
- Resident Project Representation
- Contract Management
Let’s connect.
There’s an easy way to see how we can help. Let’s Talk about it.